This was a fast-track project that required earth retention shoring and the excavation for construction of a two level below-grade structure to accommodate subterranean parking for up to 314 vehicles.
Calex is proud to have contributed alongside Pankow Builders in the early construction phases for the earthwork excavation and shoring for the 4-level subterrain parking structure.