This was a fast-track project that required earth retention shoring and the excavation for construction of a two level below-grade structure to accommodate subterranean parking for up to 314 vehicles.
April 4, 2024
The project consists of two buildings separated by a motor court, a hotel building at the North and a luxury condominium building at the South.